A professional management skill for the end-to-end lifecycle of construction engineering costs based on Chinese national standards.
The fastest way to install a skill directly from the registry.
npx clawhub@latest install cn-cost-control
Copy the skill folder to one of these locations
~/.openclaw/skills/ <project>/skills/ Priority: Workspace > Local > Bundled
Copy this prompt to OpenClaw to install it automatically.
Help me install cn-cost-control using Clawhub. If Clawhub is not installed, install it first (npm i -g clawhub).
Get the raw skill files in a ZIP archive.
This skill provides a comprehensive framework for cost engineers, project managers, and owners to manage engineering cost control in China. Built upon the GB/T 50500-2024 standard, it integrates advanced financial modeling and lifecycle monitoring capabilities into Openclaw Skills to ensure project profitability and regulatory compliance.
It covers the entire project journey from initial investment decision-making and design to bidding, construction, and final completion settlement. By utilizing this skill, users can bridge the technical gap between architectural design and financial accountability through rigorous auditing, dynamic cost tracking, and precise mathematical price adjustments.
To utilize this project management capability within your workflow, ensure your environment is initialized for construction standards.
# Install the cost control skill
openclaw install cn-cost-control
# Configure the project to follow GB/T 50500-2024 standards
openclaw configure --standard=GBT50500-2024
# Verify the installation of valuation formulas
openclaw verify-skill cn-cost-control
The skill organizes data across five primary project stages using a structured taxonomy for cost reporting and auditing.
| Data Category | Key Elements | Metadata |
|---|---|---|
| Investment | Engineering, Equipment, Reserve Fees | Estimation Basis, Price Index |
| Bill of Quantities | Civil, Foundation, Decoration, Installation | Item Code, Unit, Quantity |
| Unit Price Analysis | Labor, Material, Machinery, Management, Profit | Consumption Quotas, Market Rates |
| Dynamic Cost | Target vs. Actual Cost, Variance Rate | Monthly Reporting Cycle |
| Change Orders | Design Changes, Site Sign-offs | Submission Date, Approval Status |
Loading
A sophisticated cognitive simulation skill that prompts AI to emulate the world's leading experts rather than providing generic responses.

A specialized skill for installing and configuring security plugins within the OpenClaw ecosystem to ensure safe AI agent operations.

A professional AI skill designed to automate and standardize budget preparation for highway, railway, and waterway construction cost consulting services.

An end-to-end automation engine for Douyin short video production, from real-time trend analysis to AI video synthesis.

Museum Tour Video automates the creation of high-quality virtual tours and promotional content for museums, galleries, and cultural institutions.

A professional construction project management skill for AI agents based on the GB/T 50326 national standard of China.








































