Feasibility Study Consultant for Openclaw

Turn project ideas into evidence-backed feasibility decisions with clear assumptions, decision gates, and practical next steps.

lingyu9495-source
v1.5.2
Sep 26, 2026
0
206
0

Install & Download

1. ClawHub CLI

The fastest way to install a skill directly from the registry.

npx clawhub@latest install feasibility-study-consultant

2. Manual Installation

Copy the skill folder to one of these locations

Global
~/.openclaw/skills/
Workspace
<project>/skills/

Priority: Workspace > Local > Bundled

3. Prompt Installation

Copy this prompt to OpenClaw to install it automatically.

Help me install feasibility-study-consultant using Clawhub. If Clawhub is not installed, install it first (npm i -g clawhub).

Prefer to download?

Get the raw skill files in a ZIP archive.

What is Feasibility Study Consultant?

Feasibility Study Consultant is an Openclaw Skills framework for assessing whether a project can work, is worth pursuing, and what conditions would make it viable. It guides an AI coding agent through structured project intake, research-method selection, current-source due diligence, financial and risk analysis, assumption verification, and a documented decision.

Instead of producing a persuasive report from untested assumptions, the skill sets decision thresholds before analysis, cross-checks important facts against independent sources, and records evidence quality and uncertainty. Its templates and dependency-free Python scripts support reproducible feasibility reviews and clear Go, Conditional Go, No-Go, Hold, or Recycle recommendations.

Feasibility Study Consultant Use Cases

  • Prepare a feasibility study or business case for a proposed project, product, service, or new business line.
  • Decide whether an idea is technically, operationally, legally, and financially viable before committing significant resources.
  • Compare multiple project options using weighted decision criteria and financial analysis.
  • Assess market demand, competition, unit economics, investment requirements, and risks using current, cited evidence.
  • Validate high-impact assumptions through customer interviews, written commitments, quotes, pilots, or other measurable tests.
  • Create a decision-ready report for investors, executives, banks, or government reviewers.
  • Reassess a project when key constraints, market conditions, or policy requirements change.

How Feasibility Study Consultant Works

  1. Collect project details: Use a one-page project card and three rounds of structured questions to capture the proposal, funding, audience, timing, key question, project-specific details, and available evidence. Flag missing inputs and red lines.
  2. Define the decision: Classify the question, project type, research stage, and intended reader. Set explicit thresholds for what counts as a pass before building the case.
  3. Select suitable methods: Choose a focused set of methods from the methodology library, such as bottom-up TAM/SAM/SOM sizing, competitive analysis, unit economics, financial evaluation, scenario analysis, or a weighted comparison matrix.
  4. Research before writing: Gather current information across industry, market, competitors, policy, finance, and risk. Cross-check core data against at least two independent sources, note evidence grades, and preserve source materials.
  5. Analyze and draft: Evaluate market demand, competitive advantages, unit economics, financial returns, risks, and regulatory or resource requirements. Tailor the report to the decision-maker and identify uncertainty rather than presenting estimates as facts.
  6. Track and test assumptions: Rank assumptions by impact and uncertainty, define observable pass/fail thresholds, and specify validation methods, owners, and deadlines. Use the assumption-ledger script to surface high-impact blockers.
  7. Apply the decision gate: Compare evidence and results with the predefined thresholds. Deliver a Go, Conditional Go, or No-Go recommendation, with Hold or Recycle options where appropriate, plus the next actions and a traceable evidence record.

Feasibility Study Consultant Setup

  1. Add the skill folder to the skills directory used by your AI agent. The source repository listed in the skill metadata is https://github.com/nousresearch/hermes-skills; follow your agent's own instructions for installing or enabling skills.
  2. Keep the scripts, templates, and references in their documented relative paths so the workflow can use them.
  3. Python 3 is required to run the included scripts. The scripts are described as standard-library-only, with no external Python dependencies.
  4. Prepare project information and, when using the scripts, populate the supplied CSV or JSON inputs. For research-based conclusions, provide access to current web research tools; the skill requires up-to-date due diligence rather than relying on model memory.
# From the skill directory, inspect the included files and run the ledger tools
python3 scripts/assumption_ledger.py templates/假设台账.csv --plan
python3 scripts/assumption_ledger.py templates/假设台账.csv --json

# Inspect the scorecard input schema or example output
python3 scripts/feasibility_scorecard.py --print-schema
python3 scripts/feasibility_scorecard.py --demo

# Evaluate a completed decision-gate input
python3 scripts/feasibility_scorecard.py 立项评估.json

Feasibility Study Consultant Data Schema & Taxonomy

The skill organizes its materials into operating guidance, executable scripts, reusable templates, and method references. Paths below are relative to the skill directory.

Path or input Purpose and structure
SKILL.md Six-step workflow, research principles, methodology selection, reporting guidance, and quality checks.
scripts/feasibility_scorecard.py Standard-library scorecard that calculates weighted results, checks decision gates and critical assumptions, and supports Go, Conditional Go, or No-Go outputs. Accepts a JSON evaluation input; --print-schema and --demo expose the schema and example.
scripts/assumption_ledger.py Standard-library utility for ranking assumptions, identifying blockers, and generating a validation plan from a CSV ledger. Supports --plan and --json.
templates/项目卡.md One-page project intake card covering required questions, project-specific details, and red-line checks.
templates/引导提问清单.md Three-round structured intake questions, including follow-ups for six project types and missing-information handling.
templates/假设台账.csv Example ledger template, with columns for assumption, category, impact, uncertainty, validation method, evidence grade, status, owner, and deadline.
templates/决策门清单.md Gate criteria, threshold table, and decision-output checklist.
references/方法论库.md Ten methods with guidance on when to use them, how to apply them, required data, and common misuse.
references/方法论出处与致谢.md Public references and acknowledgments for the methods.

Ledger statuses are unverified, in_progress, verified, and falsified. Evidence is graded A (official), B (industry), C (media), or D (inference). The report should include source tables, key assumptions, blockers, financial scenarios, and a decision summary. A non-zero exit code from the ledger tool indicates high-impact assumptions remain unverified; treat these as blockers rather than silently proceeding.

Feasibility Study Consultant Advanced Features

  • Six-step decision workflow: Moves from structured intake and method selection through research, assumption testing, and gated recommendations; an early red line can stop unnecessary analysis.
  • Method selection by decision question: Matches methods to feasibility, economic viability, option comparison, or execution-path questions instead of applying every framework indiscriminately.
  • Mandatory current-source research: Requires due diligence before drafting conclusions, independent-source cross-checks for key data, source grading, and transparent treatment of conflicting evidence.
  • Assumption prioritization: Ranks assumptions by impact multiplied by uncertainty, defines measurable evidence thresholds, and records validation status, owner, and deadline.
  • Scriptable review gates: The dependency-free scorecard checks weighted criteria, thresholds, and critical assumptions; the ledger can flag unresolved high-impact assumptions for automation workflows.
  • Flexible decision outcomes: Distinguishes Go, Conditional Go, and No-Go recommendations and supports Hold or Recycle decisions when timing or evidence is insufficient.
  • Audience-specific reporting: Adapts decision criteria and report emphasis for executives, investors, lenders, or government reviewers.
  • Reusable report and intake assets: Includes a project card, question bank, decision-gate checklist, assumption ledger, and method library to make Openclaw Skills feasibility reviews more consistent and auditable.

SKILL.md


Loading

Related Openclaw Skills

METADATA

Github Stars: 0
forks: 0

Featured*